Worked example
A general merchandise warehouse books 80 vehicles per day into an 8-dock receiving hall over a 10-hour window. Average on-dock turn is 45 minutes. This is an anonymised planning case, not a named site.
Open the full caseWorked example
An outbound hall processes 850 orders per day. Packing is 2.4 minutes per order. Despatch/loading is 1.5 minutes. Five packers and four loaders are rostered on a 7.5-hour shift at 85% planned utilisation.
Open the full caseWorked example
A case-pick operation has a plan of 1,000 cases per day. Observed pick time is 3.00 minutes per case. Six pickers work 7.5 hours at 85% planned utilisation.
Open the full caseWorked example
The same 80-vehicle inbound hall, now looked at as a processing system rather than a door-count problem. Process time is the 45-minute turn. Eight docks are the servers.
Open the full caseWorked example
The picking case again, now with absence, indirect labour and overtime treated as separate levers instead of being buried in one utilisation factor.
Open the full case